With the 3rd extension now existing in this park, it's now looking like a nifty street/ jump park.
With a relatively straight forward layout but greatly satisfying transitions and nice flow between the both sections,
can't wait to get our teeth sunk into another ext. soon, hopefully if there'll be funding made available in the future.

3 x 1.5m high quarter pipes, 1.8m quarter pipe, 0.9m high jump box, 0.6m high fun box with descending grind rail and grind block, extended in 2005.
2nd ext.
double manual pad 0.6/ 0.2m high respetively, 0.3m high grind block
Completed in 2002/2005
3rd ext.
1 x 1m high multi street section containing; 3 x flat banks, combo grind block/ maual pad, wembley gap constrained to a 5 stair set with 0.45m high square rail,
1 x 1.8m high mini ramp. 1m high flat bank with 0.3m high tombstone
completed summer 2011