Region

Town

Case study

Towcester, Northamptonshire - Towcester Skate Park

1.2m flat bank, 1.2m high quarter pipe, 0.6m high driveway with 1.4 wide platform, 0.9m high flat grind block 0.3m high above driveway, flat grind block/manual pad, 0.45m high grind rail, 0.4m high grind block.

Completed in 2006

Posted: Thursday, September 03, 2009