2.74m high vert wall, 1m high driveway with tapered platform and grind block, 0.3m granite grind block/manual pad, 0.5m high granite grind block, 1.8m high flat bank, 1.5m high sunken flat bank, 0.3m high grind block/manual pad, 1.8m high half pipe slopping to 1m high, 1.5m high half pipe, 0.5m high curved granite grind block, 0.5m high flat bank. with hip and 1m of vert wall backed onto half pipe.
Completed in 2006
Posted: Thursday, September 03, 2009